The key plan for periodic and routine road maintenance work plans; it must contain the following: indicate the beginning and end of the intervention in a referenced way with their respective dimensions. reflect the whole alignment. identify the different general aspects of the plant; population centers; drainage works; existing major structures; quarries; water sources and auxiliary areas. scale 1: 20; 000 maximum.