Ad

Load break tube for road works dwg

    A total of two load break tubes will be built. these have been projected in strategic places to reduce the pressures in the conduction lines that can exceed 50 mca affecting the pipeline. the hydraulic structure will be made of reinforced concrete of fc=210 kg/cm2; with dimensions of 1.60 x 0.25 m and 1.2 in height (0.70 m being on the ground level).

    Cargando social...
    Cargando report...
    2.8kViews
    Cargando tags...