Structural plan or electrical armed both in low voltage and medium voltage. in this plane it contains the parts: pastoral for lighting poles; withheld; vertical catches with tailstocks; foundation; grounding installation; end of line installation; assembly of alignment with derivation; arming bypass change; line start arming; armed in pole of 13 meters. (medium voltage)