Multiple sports slab in that sports space dwg
The sports slab occupies an area of 720m2 (20.00m widex36.00m long) a cut of 0.20m will be made; to remove the organic material and then place two layers of one's own classified material and the other will be affirmed; which must be brought from a quarry of sacrafamilia; these two layers will be compacted and leveled; before emptying the sports slab. floor. the slab will be concrete f'c 175 kg-cm2; which will be built in cloths of 6.00 x 5.00 m .; it should be indicated that this type of emptying; it should be done in the form of checkerboard; having to form the entire perimeter first; and then form the panels internally; in the first column of cloths; starting from those who are next to the school; they will form three; in the next column three more; in the third and fourth column three panels will be formed; in such a way that; the cloths that are emptied of concrete are located in alternate form; in the first emptying, 06 cloths must be finished; in the second emptying the remaining 06 shuttering panels must be finished. in the third emptying; you must finish 06 cloths; in such a way that the interior cloths; do not need formwork; they will only be placed; plate tecknopor; to form the expansion joints. after the casting the slab must be cured for seven calendar days to each cloth; next, the asphalt mortar can only be placed in the joints and then the dividing lines corresponding to each sport can be painted. before casting the slab; they should be placed; the female pipes in which the parantes of the net for the volleyball were placed. the metallic structures will be installed for the development of the different activities. to be able to execute this slab; you have to change the route of the road; since before the project this truck path crossed diagonally the area that had to occupy the slab; the length of the new line is 90 linear meters; whose new line will pass next to the cyclopean concrete wall to be built.