Plan to which all civil and electrical works necessary for the construction of an oil platform, with its various ancillary works such as; poza sludge; poza de agua; poza fat; poza burn, chemical storage; cellar metallic (where is located the rig later), all these works taking into account the preservation of the environment so as will the use of geomembrane to cover all the ground is indispensable.