Irrigation canal demolition plan dwg

    The demolition work of the first section is a trapezoidal section concrete channel with a length of 5.15ml. in this section, a catchment pond will be built to be derived with a lateral intake; with dimensions shown on drawing 1/1-1/1-02/33. the demolition work of the second section is of an energy dissipating post, of a rectangular section with a length of 8.15ml.

    Cargando social...
    Cargando report...
    8.3kViews
    Cargando tags...