The project is developed based on the need to change coverage and remodel classrooms as well as the expansion of classrooms and the roofing of a playground; in addition to the placement of a first-class false ceiling; the project has a total planimetry of the intervention; existing architectural plans; demolition plans; remodeling plans; structural plans; on floors cuts and elevations; plans for electrical and sanitary installations; detail plans and construction cuts.